The two schools, Kirk Merrington Primary (£3.385m) and Greenland Primary School (£6.5m) both replaced ageing stock.
Awarded as two separate contracts, use of the same contracts manager and quantity surveyor enabled Surgo to work most cost effectively and improve design coordination.