Archive for February, 2019
Medburn Homes
Construction of 50 four and five-bedroom executive homes in the heart of Medburn Village. A total of seven house types will be constructed.
Excelsior Academy
Construction of a new build school on a steeply sloping site, utilising the concept of four schools within a school. Excelsior Academy educates almost 1500 students ranging in age from 3-19.
The Beacon Centre
Enabling works, including demolition of the original fire station followed by construction of the complex multi-cultural building over three storeys with a floorplate of 35,000sq ft.
Richmond House
Full internal refurbishment of existing offices to create high spec offices for rent. Additionally, work was carried out to the external envelope of the building including gutter lining and roof repairs as well as the tidying up of existing landscaping, installation of new signage and repairs to local car park.
Kenton Lodge
Refurbishment and renovation of Kenton Lodge to transform the former school into 53 luxury apartments for the over 70s.